NOTE

The use of all lifting brackets and a set of spreader
bars is mandatory when lifting unit.

4. Install Unit: Use a crane and a set of spreader bars

hooked to the
factory lifting lugs
to lift and center
the unit on the
curb/equipment
support(s).

Use self-tapping

sheet metal screws
to fasten the unit to
the curb/equipment
support(s).

3. Apply Sealant: Apply an appropriate sealant around

the perimeter of the curb to isolate fan vibration and
prevent water penetration.

Supply Air Ductwork

(Arrangement DB only)

Sealant

Installation of Arrangement DB / HZ

1. Install Curb or Equipment Support(s): Position

curb/equipment support(s) on the roof. (Reference
the CAPS submittal for placement of curb/equipment
support(s) in relation to the unit). Verify that unit
supports are level, shim if necessary. Attach curb
to roof and flash into place. Attach the equipment
support(s) to the roof, remove metal cover, flash to
wooden nailer and reinstall cover. Refer to roof curb
detail.

Roof Curb

NOTE

The use of a duct adapter is recommended on a
downblast (DB) arrangement to align the ductwork
with the supply unit. The duct adapter is only a
guide and is not to be used as a support for the
ductwork.

2. Install Ductwork: Good duct practices should be

followed for all ductwork. All ductwork should be
installed in accordance with SMACNA and AMCA
guidelines, NFPA 96 and all local codes.

Model

Supply

Duct Size

(A x B)

Distance from

right side of

Curb to Center
Supply Duct (C)

Curb

Dimension

Actual
(D x E)

DGK-109-H15

13 x 14

141/2

271/2 x 271/2

DGK-110-H15

14 x 16

DGK-112-H15

16 x 18

DGK-115-H25

18 x 22

20

451/2 x 451/2

DGK-118-H25

22 x 24

All dimensions shown are in inches.

SUPPLY

DUCT

B

23 in.

(584 mm)

A

23 in.

(584 mm)

27.5 in.

(699 mm)

Curb Length Actual

27.5 in.

(699 mm)

Curb

Width

Actual

Recommended Roof Opening

(center in curb)

Center Supply Duct

in Roof Opening

Airflow

Airflow

D

SUPPLY

DUCT

A

C

B

E

Note: Roof openings can be as large as the curb size minus
31/2 in. or as small as the duct size plus 1/2 in.
Supply Duct width (B) is centered over Curb width (E).
Supply Length (A) may not be centered over Curb Length (D).

Roof Opening Details

Model DGK Make-Up Air

®