Assembly instructions – GAMMA 6004 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 5C - February 2014) User Manual
Page 7

7
ASSEMBLY INSTRUCTIONS
String Clamp Installation
The post of the string clamp and tube of the
string clamp base are treated with grease to
provide protection against corrosion during
shipping. Remove any excessive grease with
a clean cloth prior to use. The post and tube
may also be cleaned with isopropyl alcohol.
After this type of thorough cleaning, the post
and tube should be treated with a light coating
of machine oil to protect the surfaces against
corrosion and to ensure smooth operation.
Tensioner Installation
Remove the button head screw and washer
located at the end of the tensioner bar with
the 3mm hex wrench provided. Slide the
tensioner onto the bar, being careful to align
the bar with all of the bearings and the drive
gear with the gear track. Replace the button
head screw and washer in the end of the
tensioner bar.
Turntable and Mounting System
Installation
To install the turntable position the turntable
over the turntable pin and align the bolts,
located in the poly bag, with the holes in
the fl ange. Secure them with the included
hex wrench.
- 6004 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 3 - September 2010) 5003 STRINGING MACHINE 6 POINT SC MOUNTING (Issue 10A - Febryary 2014) 5003 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 5B - February 2014) 5003 STRINGING MACHINE 6 POINT SC MOUNTING (Issue 4A - February 2014) 5003 STRINGING MACHINE 6 POINT SC MOUNTING (Issue 1 - April 2010) 5003 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 2 - December 2009) PROGRESSION STII STRINGING MACHINE (Issue 7A - February 2014)