beautypg.com

Acc-1p e-point jumper descriptions, E0: reserved for future use, E1 - e2: machine output supply voltage configure – Delta Tau PMAC2A-PC/104 User Manual

Page 51: E3 – e4: jhw, pd function select

background image

PMAC2A PC104 Hardware Reference Manual

Acc-1P E-Point Jumper Descriptions

45

ACC-1P E-POINT JUMPER DESCRIPTIONS

E0: Reserved for Future Use

E Point and

Physical Layout

Location Description

Default

E0

C6

For future use.

No jumper

E1 - E2: Machine Output Supply Voltage Configure

E Point and

Physical Layout

Location Description

Default

E1

B2

Jump pin 1 to 2 to apply +V (+5V to 24V) to
pin 10 of U7 (should be ULN2803A for sink
output configuration) JOPTO Machine
outputs M01-M08.

Jump pin 2 to 3 to apply GND to pin 10 of
U7 (should be UDN2981A for source output
configuration).

Warning:

The jumper setting must match the type of
driver IC, or damage to the IC will result.

1-2 Jumper installed

E2

B2

Jump pin 1 to 2 to apply GND to pin 10 of
U7 (should be ULN2803A for sink output
configuration).

Jump pin 2 to 3 to apply +V (+5V to 24V) to
pin 10 of U7 (should be UDN2981A for
source output configuration).

Warning:

The jumper setting must match the type of
driver IC, or damage to the IC will result.

1-2 Jumper installed

E3 – E4: JHW, PD Function Select

E Point and

Physical Layout

Location Description

Default

E3

E4

Jump pin 1 to 2 to enable handwheel channel
1 inputs.

Jump pin 2 to 3 to enable pulse and direction
channel 1 outputs.

1-2 Jumper installed

E4

E4

Jump pin 1 to 2 to enable handwheel channel
2 inputs.

Jump pin 2 to 3 to enable pulse and direction
channel 2 outputs.

1-2 Jumper installed