Figure 15.5 – modbus, f – Flowserve UEX Limitorque User Manual
Page 46

Limitorque UEX FCD LMENIM1205-03-AQ – 05/15
46
Figure 15.5 – Modbus, F
oundation
Fieldbus, Profibus DP V1, and Profibus PA, and DeviceNet Network Wiring Diagrams
NOTE: CONNECTIONS LANDED TO INTERFACE BOARD.
RECOMMENDED DEVICENET CABLE IS BELDEN 3084A OR EQUAL.
120 OHM, 1/4W TERMINATION RESISTORS MUST BE CONNECTED AT EACH SEGMENT END.
PREFERRED NETWORK WIRING IS TO CONNECT SHIELD TO TERMINAL 3 FOR EVERY UNIT ON SEGMENT.
SHIELD SHOULD BE CONNECTED TO POWER SUPPLY GROUND AT THE CLOSEST POINT IN THE CENTER
OF THE NETWORK.
DeviceNet
DEVICENET BOARD
EGND
RED
WHT
BLK
BLU
NETWORK 0V
NETWORK +24V
NETWORK DATA (–)
NETWORK DATA (+)
SHIELD
J8.5
J8.1
J8.3
J8.4
J8.2
VIA STANDOFF
BLU
WHT
BLK
RED
N/C
F
OUNDATION
FIELDBUS
TERMINALS 29 AND 41 ARE REDUNDANT AND MAY BE USED FOR DAISY CHAIN
CONFIGURATION.
NOTES:
LOSS OF COMMUNICATION ON A1 => REGISTER 9 CHANNEL A
(BIT 0x0400) SET TO 1
LOSS OF COMMUNICATION ON A2 => REGISTER 9 CHANNEL B
(BIT 0x0800) SET TO 1
PREFERRED NETWORK WIRING IS TO CONNECT ONLY ONE SHIELD TO
EARTH/GROUND. REFER TO DDC INSTALLATION DOCUMENTATION.
33
34
28
35
36
NETWORK DATA-A2
NETWORK DATA-A2*
NETWORK DATA-A1
NETWORK DATA-A1*
Modbus BOARD
Modbus
EARTH/GROUND
SURGE PROTECTION
A
REG 9.0x0400
REG 9.0x0800
B
CUSTOMER IS REQUIRED TO CONNECT WIRE BETWEEN
TERMINAL 3 AND CHASIS GROUND FOR SURGE PROTECTION.
PREFERRED NETWORK WIRING IS TO CONNECT SHIELD TO
EARTH/GROUND AT BOTH ENDS OF THE SEGMENT. ATTACH
SHIELD TO TERMINAL 3 ONLY IF DEVICE IS LOCATED AT THE
ENDS OF THE SEGMENT. CUSTOMER MUST CONNECT REMAINING
INDIVIDUAL NETWORK CABLE SHIELDS TOGETHER TO ENSURE
PROPER SHIELDING OF THE ENTIRE NETWORK.
PBDP1 (+)
PBDP1 (–)
PROFIBUS
DPV1
IEC 61158–2
Profibus DP_V1
SURGE
CUSTOMER IS REQUIRED TO CONNECT WIRE BETWEEN TERMINAL 3
AND CHASIS GROUND FOR SURGE PROTECTION. PREFERRED NETWORK
WIRING IS TO CONNECT SEGMENT SHIELD TO EARTH/GROUND AT ONE
POINT ONLY. ATTACH SHIELD TO TERMINAL 3 ONLY IF SEGMENT IS NOT
GROUNDED. ELSEWHERE, CUSTOMER MUST CONNECT INDIVIDUAL
NETWORK CABLE SHIELDS TOGETHER TO ENSURE PROPER SHIELDING
OF THE ENTIRE NETWORK.
FF1 (+)
FF1 (–)
FF1 (+)
FF1 (–)
F
OUNDATION
FIELDBUS
IEC 61158–2
F
OUNDATION
Fieldbus_H1
SURGE
CUSTOMER IS REQUIRED TO CONNECT WIRE BETWEEN TERMINAL 3
AND CHASIS GROUND FOR SURGE PROTECTION. PREFERRED NETWORK
WIRING IS TO CONNECT SEGMENT SHIELD TO EARTH/GROUND AT ONE
POINT ONLY. ATTACH SHIELD TO TERMINAL 3 ONY IF SEGMENT IS NOT
GROUNDED. ELSEWHERE, CUSTOMER MUST CONNECT INDIVIDUAL
NETWORK CABLE SHIELDS TOGETHER TO ENSURE PROPER SHIELDING
OF THE ENTIRE NETWORK.
PBPA1 (+)
PBPA1 (–)
PBPA1 (+)
PBPA1 (–)
PROFIBUS
PA
IEC 61158–2
Profibus_PA
SURGE
PBDP1 (+)
PBDP1 (–)
DDC-100:
JP1 AND JP2 MUST BE IN POSITION “A”. THE 6-[IN CONNECTOR WITH
BLUE WIRES SHOULD BE CONNECTED TO J2 OF THE DDC-100 BOARD.
33
34
28
35
36
33
34
28
35
36
33
34
28
35
36
33
34
28
35
36
TERMINALS 13 &14 FOR FOUNDATION FIELDBUS, PROFIBUS PA, PROFIBUS DP_V1
ARE USED FOR CHANNEL B ON OPTIONAL REDUNDANT NETWORK BOARD.