Unpacking the splitter and installing the wheels – DR Power Hydraulic 20-Ton User Manual
Page 14
10
DR
20-Ton WOOD SPLITTER Safety & Operating Instructions
Figure 2
Unpacking the Splitter and Installing the Wheels
The DR 20-Ton WOOD SPLITTER is shipped from the factory with the wheels
dismounted from the axles. The following instructions will detail how to unpack the
machine and assemble the wheels to the axles prior to use.
Tools & Supplies Needed:
Flat blade screwdriver
Pliers
Hammer
Knife
Gloves
Eye protection
Metal shears
Parts supplied in the plastic bag tied to the large hydraulic cylinder:
(2) Slotted Retaining Nuts
(2) Cotter Pins
(2) Hub Caps
Two wheels with inner and outer bearings are strapped to the shipping pallet and pre-
lubricated.
1. Stand to one side and cut the banding.
2. Remove the top of the carton. Separate the
stapled vertical cardboard ends from the pallet to
access the pallet straps. The staples are sharp so
be careful.
3. Pry off the fasteners and cut any ties holding the
splitter to the pallet.
4. Cut the straps holding the wheels to the pallet.
Note: The rear axle of the splitter has been raised to
allow for installation of the wheels while the
unit remains on the pallet.
5. With the valve stem facing out, slide the wheel on the axle, making certain the
inside and outside bearings remain seated in place in the wheel hub (Figure 2).
WARNING!
Always wear eye protection when cutting the banding. The
banding may have a lot of tension on it and may snap, striking you when cut.
Always stand to one side when cutting the band.
WARNING!
Always stabilize the splitter on flat terrain before
attempting to unpack and install the wheels.
Bearing
Axle