Setting up your dr generator attachment, Chapter 3, Unpacking and attaching the skids – DR Power 6000-Watt Generator User Manual
Page 13
CALL TOLL FREE 1-800-DR-OWNER 9
CHAPTER 3
SETTING UP YOUR DR GENERATOR ATTACHMENT
This chapter covers the unpacking, attaching the Skids and the procedures necessary for connecting the DR
GENERATOR ATTACHMENT to your DR
ALL-TERRAIN
Field and Brush Mower.
If you have any questions
at all, please feel free to contact our Customer Service Representatives at our toll free number:
1-800-DR-OWNER (376-9637).
Unpacking and Attaching the Skids
NOTE: We recommend two people for unpacking, as the unit weighs 90 pounds.
Parts Supplied:
•
Generator Attachment
•
Interface Relay Harness
•
Drive Belt (same as Brush Deck)
•
(2) Skids
•
Crosspiece
•
5/16-18 x 2-1/2" Bolt
•
1-1/2" Spacer
•
5/16" Lock Washer
•
(10) 5/16" Bolts, Washers & Lock Nuts
•
#10 Screw x 5/8" & #10 Lock Nut
•
Cable Ties
Tools Needed:
•
(2) 1/2" Open End Wrench
•
Phillips Screwdriver or optional wrench
1. Open the shipping container and remove the top packing piece and place it near the shipping
container (Figure 1 on page 10).
2. Remove the Crosspiece and the Parts Bag containing the Interface Relay Harness, Cable Ties, and
Hardware from the shipping container.
3. Carefully lift the DR GENERATOR ATTACHMENT out of the shipping container and rest it upside
down on the packing material from Step 1 (Figure 1 on page 10).
NOTE: One person should steady the Generator during assembly.
4. Remove the two (2) Skids from the bottom of the shipping container (Figure
1 on page 10).
5. Assemble the Belt Guide (Figure 2 on page 10) and install it on the Frame as shown. Tighten
securely.
6. Route the Generator Wire Harness through the Frame and out the rear of the Generator as shown
in Figures 2 and 3 on page 10.
7. Locate the Holes in the Frame Sides as shown in (Figure 3 on page 10). There are two (2) Holes at
the front of the Frame and one (1) at the rear on either side. Orient the Skids to match the Hole
patterns.
8. Place the Skids in the U-section Channel of the Frame and bolt them in place with six (6) Bolts,
Washers, and Lock Nuts (Figure 3 on page 10). Do not tighten completely at this time.
NOTE: The Bolt heads and Washers are on the outside and Lock Nuts are on the inside (Figure 3 on page
10).