Mechanical Installation

2-1

Section 2 : Mechanical Installation



Note: Daktronics engineering staff must approve any changes made to the display. If any
modifications are made, detailed drawings of the changes must be submitted to Daktronics for
evaluation and approval, or the warranty may be void.


2.1

Support Structure Design

Support structure design depends on mounting methods, display size and weight. The
structure design is critical and should be done only by a qualified individual. It is the
customer’s responsibility to ensure that the structure and the connectors are adequate.
Daktronics is not responsible for the installations or the structural integrity of support
structures done by others
.



2.2

Display Ventilation Requirements

Fresh air inlets and exhaust vents should not be obstructed in any way. Using the Daktronics
suggested mounting methods will ensure proper ventilation. If you are using a different
mounting method, consult a Daktronics sales representative for clearance requirements
regarding your particular display. If ventilation requirements are not met, the display warranty
will be void.



2.3 Display

Mounting

It is the customer’s responsibility to ensure that the installation will meet local standards. The
mounting hardware must be capable of supporting all components to be mounted. Daktronics
is not responsible for the installations or the structural integrity of support structures done by
others.

Daktronics recommends either a wall mount, a recessed mount or a hanging mount method.
Remember to have all mounted displays inspected by a qualified structural engineer.

2.3.1 Hanging

Mount

Reference Drawing: Shop Drawing, G-***-2-7x***-2.1 ...... Drawing A-95540

The multi-line InfoNet has two pre-drilled holes in the top of the display for use in the
hanging mounting method. To hang a display:

1. Remove the two retaining screws from the top of the display using a

Philips screw driver.

2. Slide the provided sealing washer over the threads of each eye bolt.
3. Insert the eye bolts into the pre-drilled holes on the display (refer to

Figure 1).

4. Hand tighten the eye bolts.