I-beam clamps – Daktronics TN-2601 Outdoor LED Tennis Scoreboard User Manual
Page 16

10
Mechanical Installation
I-Beam Clamps
Mounting hardware includes I-beam clamps,
1
/
2
-13 x 3" bolts,
1
/
2
" flat washers, and
1
/
2
" lock
washers. Refer to Figure 11 and Drawing A-1052539 in Appendix B.
Note: I-beams must have a flange thickness of
1
/
4
" –
3
/
4
". If flange thickness is greater
than
3
/
4
", longer bolts will be required at added expense.
1. Position the ad panel at the front of the beams, and lift it to the desired height.
2. Slide a lock washer, flat washer, and I-beam clamp onto the bolt, and loosely screw
the bolt into the spring nut.
3. Position each I-beam clamp assembly as close to the I-beam flanges as possible.
4. Make final adjustments in the positioning of the ad panel to ensure it is flush and
level, and firmly tighten all of the bolts.
Figure 11: Ad Panel Mounting with I-beam Clamps, Rear Isometric View
- TN-2603 Outdoor LED Tennis Scoreboard TN-2604 Outdoor LED Tennis Scoreboard TN-2605 Outdoor LED Tennis Scoreboard TN-2606 Outdoor LED Tennis Scoreboard TN-2607 Outdoor LED Tennis Scoreboard TN-2650 Outdoor LED Tennis Scoreboard TN-2651 Outdoor LED Tennis Scoreboard TN-2652 Outdoor LED Tennis Scoreboard TN-2653 Outdoor LED Tennis Scoreboard TN-2654 Outdoor LED Tennis Scoreboard TN-2655 Outdoor LED Tennis Scoreboard TN-2656 Outdoor LED Tennis Scoreboard TN-2657 Outdoor LED Tennis Scoreboard P1647 Single-Section Outdoor LED Scoreboard P1647 Multi-Section Outdoor LED Scoreboard FB-2500 Modular LED Football Scoreboard FB-2600 Modular LED Football Scoreboard