Contemporary Control Systems AI Active Hubs User Manual
Page 14
TD675100-0M
J
10
2.4.3
AC Powered
If only AC power is available, the AI can be powered by the
secondary of a low voltage transformer whose primary is
connected to the AC mains. The secondary voltage must be in
the range of 8 to 24 Vac with the capability of delivering up to
4 VA of apparent power. The secondary of the transformer
must not be grounded. When using a grounded secondary
transformer refer to Figure 2-4. For convenience two auxiliary
power supplies are available.
The AI-XFMR is intended for
120 Vac primary power while the AI-XFMR-E is intended for
230 Vac.
Figure 2-3. AC Powered
Figure 2-4. AC Powered with Grounded Secondary
2.4.4
AC Powered with Battery Backup
The AI can also be powered from both an AC and DC power
source. Usually the DC source is from a battery supply which is
connected as the DC powered option. Refer to the diagram for
details. In this application, the AI does not charge the battery so
separate provisions are required for charging.
If the AC source
fails, the AI will operate from the battery source.
- AI-FR Redundant Fibre Hubs (9 pages)
- AI-SRVR Servers to Ethernet Installation Guide (12 pages)
- AI-USB Adapters (12 pages)
- AI-SRVR Servers to Ethernet User Manual (20 pages)
- PCX20 Adapters (16 pages)
- MODHUB Active Hubs (32 pages)
- PCI20EX Adapters (12 pages)
- QuickLink Active Hubs (8 pages)
- USB222 Adapters (8 pages)
- BAScontrol20 Installation Guide (16 pages)
- BASgatewayLX (16 pages)
- BASremote Installation Guide (20 pages)
- BAScontrol20 User Manual (53 pages)
- BASremote Application Guide (13 pages)
- BASremote User Manual (firmware 2.x) (78 pages)
- BASrouter Installation Guide (Firmware 2.7.x) (24 pages)
- BASrouter Portable Installation Guide (Firmware 2.7.x) (20 pages)
- BASrouterLX Successful BASrouter Installation and Operation (3 pages)
- BASrouterLX Installation Guide (12 pages)
- BASrouterLX Application Guide (20 pages)
- CAN104 (8 pages)
- CANPCI (8 pages)
- BASview (81 pages)
- Compact Unmanaged Switches (4 pages)
- EIBA BAS Unmanaged Switches (4 pages)
- EIDX Managed Automation Switches Installation Guide for PoE Models (8 pages)
- EIPR Wired/Wireless VPN Router Installation Guide (4 pages)
- EIDX Managed Automation Switches Software Manual for Console Access (80 pages)
- EISK Managed Skorpion Switches Software Manual (83 pages)
- EIS UL864-Compliant Switches (8 pages)
- EISC Configurable Switches Installation Guide (8 pages)
- EISK Skorpion Switches EISK8-GT (4 pages)
- EISK Managed Skorpion Switches Installation Guide (4 pages)
- EIPR Wired/Wireless VPN Router Application Guide (14 pages)
- EISC Configurable Switches User Manual (36 pages)
- EISK Skorpion Switches EISK5-100T/FCS (4 pages)
- BACnet Cube I/O BMT-DI4 (3 pages)
- BACnet Cube I/O BMT-DI10 (3 pages)
- BACnet Cube I/O BMT-AI8 (4 pages)
- BACnet Cube I/O BMT-SI4 (3 pages)
- BACnet Cube I/O BMT-DO4 (3 pages)
- BACnet Cube I/O BMT-AO4 (3 pages)
- Sedona (27 pages)
- BACnet Cube I/O BMT-DIO4/2 (4 pages)