2putting up – connection – setup – Beisler 1710-5 User Manual
Page 25

2-3
2
Putting up – Connection – Setup
ATTENTION
This machine may only be installed and put into operation by mechanically
and electrically qualified staff. This personell must read and understand the
complete Operating Instructions before.
2.1
Technical data
Dimensions
00 x 00 x 00 mm (LxWxH)
Table height
00 mm (adjustable)
Weight
00 kg
Electrical conn.
220 V AC
Power consumption
00 kW
Fuse
15 A
Compr. air conn.
min. 5 bar
Req. compr. air quality free of oil
Compr. air consumptionest. 00 NL/part
2.2
Mechanical Installation
ATTENTION
Check prior to the installation, whether the desired location corresponds with
the environmental requirements for the machine. Please see section ‘Technical
Data’ for further information.
2.2.1
Unpacking and Putting up
1. Remove the packing material and possible transportation lockings.
2. Position the machine on a horizontal grounding.
3. Level the machine with the adjustable feet to a horizontal stand.