Installation, Packing list, Additional items required – Avalon Firestyles 564 Diamond-Fyre GSR2 Installation User Manual
Page 7: Installation overview, Recommended installation procedure, For qualified installers only)

Installation
(for qualified installers only)
7
© Travis Industries
4140926
100-01395
Packing List
Propane Conversion Parts
Firestop (sku 250-00747)
Remote
Additional Items Required
If using LP (propane) a conversion kit is required (sku 94400999 – GSR Stepper Motor Kit).
Direct
Vent
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)
Crushed Glass (Platinum 94500580 – Bronze 94500581 – Cobalt 94500582)
564DF Firebacks (Stainless Steel 96100208 - Black Enamel 96100210 - Painted Black 96100211)
Installation Overview
All requirements below must be met.
Recommended Installation Procedure
Frame the opening for the fireplace. Make sure to allow for vent installation.
This fireplace is designed to accommodate 1/2" (13mm) or 5/8" (16mm) drywall (see "Nailing
Brackets" on page 18 for details). Secure the fireplace to the framing.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 47) and install the grill or face.
See the section
"Approved Vent
Configurations"
See the section
"Electrical Connection"
See the section
"Mantel Requirements"
Insulation must not fill
the 1/2" (13mm)
clearance around the
back and sides of the
fireplace.
See the section
"Vent Requirements"
See the section "Minimum
Framing Dimensions"
Drywall
Top Vent
Configuration
Rear Vent
Configuration
See the section
"Gas Line Installation"
Side
Wall
See "Optional Non-
Combustible Facing"
Drywall
See "Optional Non-
Combustible Hearth"
Nailing Brackets
Required Travis
Firestop (sku
250-00747)
1" Min.
25mm