Hardware Preparation and Installation

2.1

Overview

This chapter describes all necessary steps you need to take in order to install the RTM-ATCA-
F120-OPT. The main steps are:

Inspect the shipment and unpack the RTM

Make sure environmental and power requirements are met

Install the RTM

2.2

Unpacking and Inspecting the RTM

To inspect the shipment, perform the following steps.

Shipment Inspection

1. Verify that you have received all items of your shipment:

Printed user manual (Getting Started guide)
RTM-ATCA-F120-OPT

Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten their life.
Before touching the blade or electronic components, make sure that your are working in an
ESD-safe environment.