Hardware preparation and installation, 1 overview, 2 unpacking and inspecting the rtm – Artesyn RTM-ATCA-F120 Installation and Use (August 2014) User Manual
Page 27: 1 overview 2.2 unpacking and inspecting the rtm, Chapter 2
![background image](https://www.manualsdir.com/files/772542/content/doc027.png)
Chapter 2
RTM-ATCA-F120-OPT Installation and Use (6806800G29D)
27
Hardware Preparation and Installation
2.1
Overview
This chapter describes all necessary steps you need to take in order to install the RTM-ATCA-
F120-OPT. The main steps are:
Inspect the shipment and unpack the RTM
Make sure environmental and power requirements are met
Install the RTM
2.2
Unpacking and Inspecting the RTM
To inspect the shipment, perform the following steps.
Shipment Inspection
1. Verify that you have received all items of your shipment:
Printed user manual (Getting Started guide)
RTM-ATCA-F120-OPT
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten their life.
Before touching the blade or electronic components, make sure that your are working in an
ESD-safe environment.