3 Wiring

3.1 Electrical Preparation



All electrical work must be carried out by a properly licensed electrician. Failure to observe this
point will void the factory warranty for the Tempest Enclosure and possibly the equipment housed

inside.

1

Before starting work, switch off power to the branch circuit, carefully following lockout and tag-out

procedures. Failure to do so could cause serious injury or death.

2

Two electrical junction boxes will be required within a short distance of the LIZA enclosure for:

AC supply wiring

DMX control wiring

Your LIZA enclosure is supplied fitted with two cable entry points, for Power and signal cables.

The cable entries are suitable for use with standard conduit fittings. US size ½”, international 20mm.

All junction boxes must be installed in accordance with local electrical codes and should be located near the

permanent installation of the enclosure.

The AC supply must be protected by a fuse or circuit breaker of a rating suitable for the equipment.

The user may connect the enclosure and the equipment enclosed to the same switched supply, or run them

separately, according to preference (see below).

Note that for temporary installation, the conduit fittings may be replaced with suitable cable entry glands,

at the user’s discretion.