beautypg.com

NEXCOM ICES 667 User Manual

Page 76

background image

Copyright © 2013 NEXCOM International Co., Ltd. All Rights Reserved.

62

ICEK 667-T6 Starter Kit User Manual

Chapter 3: System Setup

There is a metal plate supporting the mainboard that can be lifted up or
lowered down. The instructions below illustrate the step-by-step procedures.

NOTE: Before lifting up or lowering down, make sure the two spring-nuts
located on the left and right side of metal support plate are inserted/closed
to the end-position as depicted in the diagram below.

1. Hold on the left and right spring-nuts using both hands, and pull out

the spring-nuts to lift up or lower down.

2. After lifting up the mainboard, make sure the two spring-nuts are

inserted and closed in the end-position before plugging

any connectors and I/O cards, then power on the system.

3. After lowering down the mainboard, make sure the two spring-nuts

are inserted and closed to the end position before powering off the

system and closing the cover.

Left spring-nut

Right spring-nut