Hgsw-42shp – Neotech Communications HGSW-42SHP User Manual
Page 3
HGSW-42SHP
Self-Configured Hardened 4-port 10/100/1000Base-T + 2-port 1000Base-X SFP Ethernet Switch with PoE+/PSE
3
V1.0
DIN Rail Installation
HGSW-42SHP can be installed on a DIN rail. Installation steps are as follows:
Removal:
1. Pull down the metal part, pull out the lower part of the DIN rail clip until it leaves the track.
2. Lift up the upper part of the clip until the switch separate from the track.
Wall Mount Installation
1. Put the switch close to the
DIN rail track. Lock the upper
part of the DIN rail clip on the
upper side of the track.
2. Press the switch until
the metal part move
downward and a “click”
sound is heard.
3. The metal part is then moved
back to its original position. The
switch is securely locked on the
track. The installation is
completed.
Upper
part
Metal
part
1. Remove the screws to
take out the DIN rail clip
from the switch.
2. Tighten the screws to fix the
wall mount plate and the switch
together.
3. Mount the switch on the wall
or on a flat surface with 2 screws
piercing through the mounting
holes to secure it in position.
Mounting
Holes