Deleting the maximum demand maximum value, Contracted power, Selecting the maximum demand variable – CIRCUTOR MDC-4 User Manual
Page 20: Period of maximum demand integration, Clea pd max no, Set pd v p (w), Set pd 015

4�8�2� Selecting the maximum demand variable
SET PD V
P (W)
In this step the variable for calculation the maxi-
mum demand is programmed.
Press the
button to select between the pos-
sible options:
W: Active power.
VA: Apparent power.
mA: Current III
Press the
key to access the next programming step.
4�8�3� Period of maximum demand integration
Set PD
015
In this step the maximum demand integration
period is programmed.
Press the
button to increase the digit that is
currently flashing.
When the desired value is shown on the screen, move onto the next digit by pressing the key
to modify the remaining values.
Maximum value: 60 minutes.
Minimum value: 1 minute.
Press the
key to access the next programming step.
4�8�4� Contracted power
Set (W/v/m)
_05000
In this step the contracted power for the installa-
tion is programmed.
Press the
button to increase the digit that is
currently flashing.
When the desired value is shown on the screen, move onto the next digit by pressing the key
to modify the remaining values.
Maximum value: 500,000 (W /VA / mA)
Minimum value: 0 (W /VA / mA)
Press key
to access the next programming step.
4�8�5� Deleting the maximum demand maximum value�
Clea PD mAX
NO
In this step you select whether or not to delete
the maximum demand maximum value.
Press the
button to select between the two
possible options: No or Yes.
20
MDC-4
Instruction Manual