beautypg.com

Installation (continued) – Nexen DPC-13T 962200 User Manual

Page 7

background image

7

FORM NO. L-20093-L-1209

PILOT CLUTCH

Refer to Figures 3 & 4.

NOTE: The Pilot Clutch is a combination of the Element

Clutch and a Pilot Assembly.

1. Install Support Bushing, if required.

NOTE: The Support Bushing provides radial load support

at the shaft, and is used when bore sizes smaller

than standard are required.

a. Place Pilot Assembly face down, and fully support

the flange of the Extension Hub (Item 22).

b. Insert the Support Bushing into the bore of the

Extension Hub (Item 22).

c. Apply even pressure around the entire diameter of

the Support Bushing, and press the Support Bushing

into the Extension Hub.

NOTE: Do not use a hammer to install the Support

Bushing; a small Arbor Press is recommended.

2. Push the Pilot Assembly into the Element Clutch, and align

the counterbored holes in the Pilot Housing (Item 23) with

the tapped holes in the Flange Mount Disc (Item 5).

3. Install the Cap Screws (Item 21), and tighten them to the

recommended torque (See Table 4).

4. Align the counterbored holes of the Splined Hub (Item 1)

with the tapped holes of the Hub Extension (Item 22).

5. Install Cap Screw (Item 28), and tighten them to the

recommended torque (See Table 4).

6. Thoroughly inspect the tapered bore of the Splined Hub,

and the tapered surface of the Q.D. Bushing; remove any

dirt, grease, or foreign material.

NOTE: Do not use lubricants when installing the Q.D.

Bushing.

7. Install the Q.D. Bushing into the Splined Hub; aligning

the untapped holes in the Q.D. Bushing with the tapped

holes in the Splined Hub.

NOTE

Do not strike the Q.D. Bushing to “set” it in the tapered

bore.

8. Loosely insert the Pull-Up Bolts, and Lockwashers into

the Q.D. Bushing, and tapped holes of the Splined Hub.

NOTE: Do not use lubricants or thread locking compounds

on the Pull-Up Bolts.

9. Measure the motor shaft runout. The runout must not

exceed 0.002 T.I.R. (Total Indicator Reading).

10. Insert Key into keyway.

11. Slide “DPC” Pilot Clutch onto the motor shaft.

Support
Bushing

23 5

28

Q.D. Bushing

1

Pull-Up

Bolts

22

21

FIGURE 3

TABLE 4

N

O

I

T

P

I

R

C

S

E

D

T

3

1

-

C

P

D

T

5

1

-

C

P

D

)

1

2

m

e

tI

(

w

e

r

c

S

p

a

C

.

T

F

9

1

1

.

S

B

L

.

T

F

9

1

1

.

S

B

L

)

8

2

m

e

tI

(

w

e

r

c

S

p

a

C

.

T

F

8

4

.

S

B

L

.

T

F

8

4

.

S

B

L

0

2

m

e

tI

(

t

u

N

k

c

o

L

.

T

F

0

7

.

S

B

L

.

T

F

0

7

.

S

B

L

s

tl

o

B

P

U

-l

l

u

P

.

T

F

5

7

.

S

B

L

.

T

F

2

1

1

.

S

B

L

INSTALLATION (continued)

12. Alternately, and evenly tighten Pull-Up Bolts to the

recommended torque (See Table 4).

NOTE

Do not over tighten Pull-Up Bolts. If excessive tightening

torque is applied, bursting pressure is created in the

Splined Hub.

NOTE: Runout is minimized if a Dial Indicator is used as

the Q.D. Bushing Pull-Up Bolts are tightened.

Place the contact tip of the Dial Indicator on the

machined surface of the Splined Hub to measure

runout. Runout on this surface must be within

0.003 T.I.R. when the Pull-Up Bolts are tightened.

Dial
Indicator

Pull-Up

Bolts

Q.D. Bushing

FIGURE 4