Vortech GM 5.3L/6.2L Light Truck/SUV - 2007-2008 User Manual
Page 12
P/N: 4GL020-018
©2008 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
11NOV08 GM Trk/H2(4GL..018v2.0)
2
A. Install the original alternator bushings into the
supercharger mounting bracket with the
flanged portion pointed back. (See Figs. 2-a,
2-b.)
B. Clean front of driver’s side head of debris.
C. Bolt the supplied Vortech supercharger
mounting bracket to the head and block using
the original mounting bolts. Make sure the
mounting bracket is seated directly on a
machined surface on the head and that no
wires are pinched.
D. Tighten the four mounting bolts to 37 ft-lbs
(50 N-m).
E. Install the two original bolts holding the alter-
nator fusible link junction box in the super-
charger mounting bracket so that it is in the
stock location.
F. Attach the power steering pump to the
Vortech bracket using the original mounting
hardware. Tighten the four power steering
pump bolts to 37 ft-lbs (50 N-m). (One bolt is
still loosely inserted in the engine block.)
G. Reinstall the power steering pump pulley.
Make sure that it is seated flush with the end
of the power steering pump shaft.
H. Reinstall the alternator using the original
hardware. (See Fig. 2-c.)
I. Install the factory idler pulley at the location
shown in Fig. 4-b. Spin the idler to verify that
the rotating portion does not contact the alter-
nator bolt.
Fig. 2-a
2.
SUPERCHARGER MOUNTING BRACKET
Fig. 2-b
Fig. 2-c