beautypg.com

StorCase Technology 12-Bay 4U SCSI Ultra320 User Manual

Page 19

background image

14

Installation

StorCase Technology, Inc.

InfoStation 12-Bay Installation Guide - Rev. A02

Installing the RAID Battery Backup Unit(s) into the InfoStation

CAUTION:

Remove ALL power from the InfoStation before installing the RAID Battery

Backup Unit(s). Refer ALL servicing to qualified service personnel!

Danger of explosion if the RAID battery is incorrectly replaced! Replace only

with the same or equivalent type recommended by the manufacturer. Dis-

pose of used batteries according to the manufacturer's instructions.

NOTES:

Please refer to RAID manufacturer's battery specifications. StorCase InfoSta-

tion RAID batteries are 3-cell NiMh, nominal battery voltage = 4.2V fully

charged, 1600 to 2100 mAh.

While performing the steps in this section, work on a soft surface to prevent

excessive shock to the Power Supply/Blower Module and/or InfoStation

chassis.

The Battery Backup Unit (Figure 15) provides writeback cache backup power to the RAID

Controller should the power fail for any reason.

To install the RAID Battery Backup Unit(s):

1.

Loosen and remove the #6-32 Phillips Flat Hd. screw securing the blank plate to the

Power Supply/Blower Module (Figure 16). Remove blank plate.

2.

Install the RAID Battery Backup Unit into the Power Supply/Blower module (Figure

17).

3.

Tighten the thumbscrew to secure the Battery Backup Unit into place.

Figure 15: RAID Battery Backup Unit

IFSII_DR10