beautypg.com

Carrier installation – StorCase Technology DE75i-SWC User Manual

Page 28

background image

DE75i-SWC User's Guide - Rev. B00

StorCase Technology Inc.

Appendix B - Factory-Installed Options

21

WARNING:

Be careful not to remove or disturb the carrier unit at this point.

Although the carrier is physically unlocked, the drive requires a

minimum of 15 seconds to spin down and is subject to vibration and

possible damage during this period.

3. As the unit number flashes, the Hot Swap Board monitors the activity of the SCSI

bus. When activity is no longer present, the Hot Swap Board will remove power

from the drive and then remove the device from the SCSI Bus. The unit number

will continue to flash during this period.

4. After a short length of time the unit display will turn from a flashing unit number to

a steady "u", indicating that the device is powered down, unlocked and ready to

be removed from the receiving frame.

Carrier Installation

Follow the procedures below to install the DE75i-SWC Carrier into the receiving frame

equipped with the Hot Swap option.

1. Install the carrier into the receiving frame. A "u" will be present on the front panel,

indicating that the carrier is in an unlocked condition.

2. Turn the key lock mechanism, located on the front of the receiving frame, counter-

clockwise to the ON position. This locks the drive into the receiving frame and

activates the Hot Swap Board. The drive will begin to spin up and the unit number

on the display will begin flashing.

3. After a short length of time the unit display will stop flashing, indicating that the

device is ready to be used.