Now that the installation is properly prepared, you are ready to inspect,
install, and certify the PuriCare Procedure Station. This chapter covers how
to:
• Unpack and move the Procedure Station.
• Install the cabinet.
• Connect the electrical supply source.
• Connect the service lines.
• Connect to an exhaust system (optional).
• Arrange certification of the Procedure Station.
Tools required for installation include two 1/2" wrenches, a flat-blade
screwdriver, a #2 Phillips screwdriver, and a carpenter’s level.
Note: The Procedure Station models weigh between 500-700 lbs. (228-318
kg). The shipping pallet allows for lifting with a mechanical lift truck or
floor jack. If you must lift the product manually, use at least six (6) persons
and follow safe-lifting guidelines.
Note: The side panels must be removed to access the fasteners that secure the
Procedure Station to the pallet. DO NOT ATTEMPT TO LIFT BY THE
SIDE PANELS; DAMAGE WILL OCCUR.