Hapter, Rerequisites, Support, vibration and movement requirements – Labconco Purifier Filtered PCR Enclosures 3970425 User Manual
Page 9

Product Service 1-800-522-7658
5
C
HAPTER
2
P
REREQUISITES
Before you install the Filtered PCR Enclosure, you need to prepare your site for
installation. You must be certain that the area is level and of solid construction. In
addition, a dedicated source of electrical power should be located near the
installation site to power the Filtered PCR Enclosure, and other apparatus.
Additionally, the enclosure should be strategically placed in the lab to provide
efficient workflow.
Carefully read this chapter to learn the requirements for your installation site:
The support, vibration and movement requirements.
The location and air current requirements.
The exhaust and blower requirements.
The electrical power requirements.
The space requirements.
Refer to Appendix B: Dimensions for complete enclosure dimensions.
Refer to Appendix C: Filtered PCR Enclosure Specifications for complete filtered
enclosure electrical and environmental conditions, specifications and requirements.
Support, Vibration and Movement
Requirements
At a minimum, the supporting structure usually consists of a base cabinet or base
stand and chemically-resistant work surface.
- Purifier Filtered PCR Enclosures 3970422 Purifier Filtered PCR Enclosures 3970405 Purifier Filtered PCR Enclosures 3970402 Purifier Filtered PCR Enclosures 3970325 Purifier Filtered PCR Enclosures 3970322 Purifier Filtered PCR Enclosures 3970305 Purifier Filtered PCR Enclosures 3970302 Purifier Filtered PCR Enclosures 3970225 Purifier Filtered PCR Enclosures 3970222 Purifier Filtered PCR Enclosures 3970205 Purifier Filtered PCR Enclosures 3970202