beautypg.com

1 technical information – Glow-worm hxi and Gas Valve User Manual

Page 9

background image

9

0020008153-05

1.1 IMPORTANT NOTICE

The boiler is supplied in one carton, which includes a fittings and
documentation pack.

This boiler is for use only on G20 natural gas, but the 30hxi may
be converted for use on G31 gas (Propane L.P.G.).

Where no British Standards exists, materials and equipment
should be fit for their purpose and of suitable quality and
workmanship.

The installation of this boiler must be carried out by a competent
person
in accordance the rules in force in the countries of
destination.

Manufacturer’s instructions must not be taken as overriding
statutory requirements.

1.2 Statutory Requirements

The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force.

In GB the installation of the boiler must be carried out by a
competent person as described in the following regulations:

The manufacturer’s instructions supplied.

The Gas Safety (Installation and Use) Regulations.

The appropriate Buildings Regulations either The Building
Regulations, The Building Regulations (Scotland),The Building
Regulations (Northern Ireland).

The Water Fittings Regulations or Water byelaws in Scotland.

The Health and Safety at Work Act, Control of Substances
Hazardous to Health (COSHH).

The Current I.E.E. Wiring Regulations.

Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.

In IE, the installation must be carried out by a competent person
and installed in accordance with the current edition of I.S.813
"Domestic Gas Installations", the current Building Regulations
and reference should be made to the current ETCI rules for
Electrical Installation.

In GB the following Codes of Practice apply:

BS4814, BS6798, BS5440 Part 1 and 2, BS5546 Part 1,
BS5449, BS6891, BS6700, BS7074 Part 1 and 2, BS7593,
BS7671.

In IE: I.S.813, BS5546, BS 5449, BS 7074, BS 7593.

Manufacturer’s instructions must not be taken as overriding
statutory requirements.

NOTE: For further information, see the current issue of the
Building Regulations, approved document L1 ( in the UK) and
the following current issues of:

1) Central heating system specification (CheSS) and

2) Controls for domestic central heating system and hot water.
BRECSU.

1 Technical Information

Certification

This boiler certificated to the current issue of EN 483 for
performance and safety.

It is important that no alteration is made to the boiler, without
permission, in writing, from Glow-worm.

Any alteration that is not approved by Glow-worm, could
invalidate the warranty and could also infringe the current issue
of the Statutory Requirements.