4 installation, 5 casing location / fitting – Glow-worm Hideaway 40BF User Manual

Page 12

background image

12

221691B

;;

;;;

;;;

;;;

;;;

;;;

;;

Diagram 4.7

PREPARED HOLE IN
THE WALL DIMENSIONS

4 Installation

240

(9

1/

2

in.)

BALANCED
FLUE DUCT
FROM BOILER

360

(14

1/

4

in.)

485
(19 in.)

PREPARED
HOLE IN
THE WALL

3 (

1/

8

in.)

MIN.

0876

Diagram 4.8

TERMINAL AND AIR DUCT -
STANDARD OR SHORT

0891

BOILER AIR DUCT

WALL
PLATE

INNER BAFFLE/
FLUE DUCT
ASSEMBLY

SCREW (4)

OUTER BAFFLE

WIRE GUARDS

AIR DUCT
ASSEMBLY

4.8 Boiler Connection

Connect the boiler to the system pipework.

Make the gas connection to the service cock, at the lower right
hand side of the boiler.

5.1 Vent Grille

One vent grille is supplied with the boiler, which can be fitted at
the rear of the left or right hand side casing. The grille is fitted
on the opposite side to any pipework connections.

Fit the grille, if required, to the side panel where no water pipes
are connected, as shown in diagram 5.1 before fixing the side
panel. The plastic pegs are a tight fit and are best pushed home
with a flat faced tool.

Discard the grille if the water connections are made on both
sides of the boiler or if the boiler is screened by fixtures.

5.2 Side Casings

Fit the side casings by locating their lugs into the appropriate
slot in the boiler plinth, see diagram 5,2, depending on the
required height, see Section 1.7.

Secure the casing sides to the front upper brackets.

5 Casing Location / Fitting