East Coast Supercharging ECS Alky 5th Gen User Manual
Page 7
5) Under-hood wiring
Power to the system will come via the supplied relay. Mount it next to fuse box
by the core support and attach Red wire with O-ring to power post by the fuse
box. Gray wire will be attached to the IGN fuse in the box using supplied tap.
Black will need to be grounded. The long red wire will be routed into the vehicle.
At this point start routing the pump and low level wiring through the rear of the
engine compartment using supplied loom.