East Coast Supercharging ECS Paxton SC1500 C6 Supercharger Kit User Manual
Page 35

Next using the supplied hardware ground the
BLACK wire from the ECS bap to the existing
stud on the frame
Find a suitable location for the supplied Hobbs
switch near a vaccum source and install the sup-
plied vacuum tee and run supplied 5/32 vacuum
hose from the installed vacuum tee to the barb
fitting on the hobbs switch.
The remaining brown wire from ECS bap goes
to one of the hobbs switch terminals, it does
NOT matter which one for polarity is not im-
portant.
Using the supplied BLACK wire and termi-
nals run a ground up to the other hobbs switch
terminal and to the same ground stud used for
the BAP
Recover wiring harness with factory loom, and
cover with electrical tape as necessary.
ECS BAP Installation Complete!!!