beautypg.com

Dunkirk Excelsior EXB Series User Manual

Page 9

background image

9

• Carefully examine complete vent system for leaks. This

may be done by spraying soapy solution on all joints

and watching for bubbles during pre-purge. The hot vent

can be checked with lit taper for signs of air movement

around joints or seams.

• Insure all safety devices and electrical components

have been set for normal operation. Insure all electrical

connections are tight and wiring is secure.

• Insure homeowner is informed and understands the

following:

1.

Where circuit breaker or fuse is located in main

electrical panel.

2.

Where Boiler switch is located, and switch “on” and

“off” positions if not obvious.

3.

Where oil shut-off valve from oil storage tank is

located.

4.

To keep area around vent terminal free of snow, ice,

and debris.

5.

How to operate the thermostat, and other related

accessories.

6.

How to operate manual reset button on primary

control, and especially when not to push the reset

button.

7.

How and where to visually inspect the venting system

for leaks or other problems.

8.

How to inspect, clean and replace the air fi lter, and

other homeowner maintenance procedures.

9.

Who to call for emergency service and routine annual

service.

10.

Terms and conditions of the manufacturer’s warranty

and the contractor’s warranty.

FINAL CHECK OUT