beautypg.com

Tr50, Sk850 operator’s manual – Ditch Witch SK850 Footings Machine User Manual

Page 78

background image

SK850 Operator’s Manual

Service - 77

Startup/10 Hour

CMW

®

TR50

Lube Auger Bearing

Lube auger bearing zerk with MPG every 10
hours.

Check Digging Chain Tension

Check digging chain tension every 10 hours and
adjust as needed. With boom horizontal, measure
distance A from bottom of boom to chain. When
properly tensioned, distance A should be 1.5-2.0”
(38-51 mm).

Adjustment Screw:

1.

Loosen four clamp bolts (2) so that boom
slides freely.

2.

Loosen jam nut on adjustment screw (1).

3.

To tighten digging chain, turn adjustment screw clockwise. To loosen digging chain, turn
counterclockwise.

4.

When proper tension is reached, tighten jam nut.

5.

Torque clamp bolts to 75 ft•lb (102 N•m).

NOTICE: Do not overtighten chain.
Overtightening will cause chain stretch, loss
of machine performance, and possible
premature chain failure.

t43om035w.eps

t43om036w.eps