Procedure, Sk850 operator’s manual – Ditch Witch SK850 Footings Machine User Manual
Page 56
SK850 Operator’s Manual
Transport - 55
Lift
CMW
®
Procedure
Use a hoist capable of supporting the
equipment's size and weight. See
“Specifications” on page 97 or measure and
weigh equipment before lifting.
Use one of the methods below:
•
Use two points nearest operator station.
•
Use three lift points as shown.
IMPORTANT: Front of unit will be lower than
rear of unit when using only two lift points.
NOTICE: Do not lift unit with attachments
installed.
t43om008w.eps
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)