Prepare unit for towing, Return unit to normal operation, Sk850 operator’s manual – Ditch Witch SK850 User Manual
Page 61
Transport - 60
SK850 Operator’s Manual
Tow
CMW
®
Prepare Unit for Towing
1.
Block tracks.
2.
Engage parking brake (shown).
3.
Loosen bypass valves (shown) three turns.
Return Unit to Normal Operation
1.
Tighten bypass valves and tighten locknut to 15-18 ft•lb (20-25 N•m).
2.
Disengage parking brake.
3.
Unblock tracks.
IMPORTANT: Open bypass valves in both
front and rear pumps.
NOTICE: When bypass valves are open, unit
has no brakes.
IMPORTANT: Close bypass valve in both front and rear pumps.
t43om012w.eps
t43om030w.eps
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)