Unload, Sk850 operator’s manual – Ditch Witch SK850 User Manual
Page 59
Transport - 58
SK850 Operator’s Manual
Haul
CMW
®
Unload
1.
Prepare trailer and ramps for unloading.
2.
Remove tiedowns.
3.
Start engine.
4.
Disengage parking brake.
5.
Pull lift arm control to raise mount plate (and attachment) off ground, but keep it low.
6.
Adjust throttle to low speed and slowly back unit down trailer or ramps.
Crushing weight. If load falls or moves it could kill or crush
you. Use proper procedures and equipment or stay away.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Attach trailer to vehicle before loading or unloading.
•
Only operate unit from operator platform.
•
If unloading from tilt-bed trailer, be prepared for trailer to tilt.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)