Fig. 15—wiring diagram – Carrier 58MSA User Manual
Page 11
Fig. 15—Wiring Diagram
A00197
PCB
BLOWER OFF DELAY
SELECTION CHART
90 SEC
135 SEC
180 SEC
225 SEC
GVR
HI/LO
RELAY
SEC-1
SEC-2
WHT
PL1
3 2 1
6 5 4
9 8 7
LED
TEST/TWIN
BLOWER
OFF
DELAY
G
R
Y
W
C
HUM
HSIR
IDR
BLWR
BLOWER
SPEED
SELECT
FU1
COOL
HEAT
L2
PL3
PL2
VAC
120
L1
PR1
1
2
1
2
3
PR2
24 VAC-3A
FUSE
SPARE-2
SPARE-1
EAC-1
EAC-2
C
1.
5
A
M
P
1
2
PL5
WHT
BRN
GRN/YEL
BLK
IDM
BRN
CAP -2
WH
T
WH
T
BL
K
BL
K
HSI
AUX
OL
M
BLK
WHT
WHT (COM)
RED (LO)
BLU (MED LO)
NOTE #8
OL
START
BLWM
YEL (MED HI)
BLK (HI)
BRN
BRN
TR
A
N
BLU
RED
BLK
WHT
WHT (COM)
CAP -1
RED
FSE
FRS
BLU
YEL
RED
NOTE #6
LS
RED
ORN
PRS
(WHEN USED)
LGPS
FUSED DISCONNECT
SWITCH (WHEN REQ'D)
NOTE #4
WHT
JB
LEGEND
BLWR
BLOWER MOTOR RELAY, SPST-(N.O.)
BLWM BLOWER MOTOR
CAP
CAPACITOR
CPU
MICROPROCESSOR AND CIRCUITRY
EAC-1
ELECTRONIC AIR CLEANER CONNECTION (115 VAC 1.5 AMP MAX.)
EAC-2
ELECTRONIC AIR CLEANER CONNECTION (COMMON)
FRS
FLAME ROLLOUT SW. -MANUAL RESET, SPST- (N.C.)
FSE
FLAME PROVING ELECTRODE
FU1
FUSE, 3 AMP, AUTOMOTIVE BLADE TYPE, FACTORY INSTALLED
FU2
FUSE OR CIRCUIT BREAKER CURRENT INTERRUPT DEVICE
(FIELD INSTALLED & SUPPLIED)
GND
EQUIPMENT GROUND
GV
GAS VALVE-REDUNDANT OPERATORS
GVR
GAS VALVE RELAY, DPST- (N.O.)
HI/LO
BLOWER MOTOR SPEED CHANGE RELAY, SPDT
HSI
HOT SURFACE IGNITOR (115 VAC)
HSIR
HOT SURFACE IGNITOR RELAY, SPST- (N.O.)
HUM
24VAC HUMIDIFIER CONNECTION (.5 AMP. MAX.)
IDM
INDUCED DRAFT MOTOR
IDR
INDUCED DRAFT RELAY, SPST- (N.O.)
ILK
BLOWER ACCESS PANEL INTERLOCK SWITCH, SPST- (N.O.)
JB
JUNCTION BOX
LED
LIGHT-EMITTING DIODE FOR STATUS CODES
LGPS
LOW GAS PRESSURE SWITCH, SPST-(N.O.)
LS
LIMIT SWITCH, AUTO RESET, SPST(N.C.)
OL
AUTO-RESET INTERNAL MOTOR OVERLOAD TEMP. SW.
PCB
PRINTED CIRCUIT BOARD
PL1
9-CIRCUIT CONNECTOR
PL2
2-CIRCUIT PCB CONNECTOR
PL3
3-CIRCUIT IDM CONNECTOR
PL4
3-CIRCUIT IDM EXTENSION CONNECTOR
PL5
2-CIRCUIT HSI/PCB CONNECTOR
PRS
PRESSURE SWITCH, SPST-(N.O.)
SW1 & 2
BLOWER OFF DELAY
TEST/TWIN
COMPONENT TEST & TWIN TERMINAL
TRAN
TRANSFORMER-115VAC/24VAC
JUNCTION
UNMARKED TERMINAL
PCB TERMINAL
FACTORY WIRING (115VAC)
FACTORY WIRING (24VAC)
FIELD WIRING (115VAC)
FIELD WIRING (24VAC)
CONDUCTOR ON PCB
FIELD WIRING TERMINAL
FIELD EARTH GROUND
EQUIPMENT GROUND
FIELD SPLICE
PLUG RECEPTACLE
L1
L1
BLWR
HI/LO
TO 115VAC FIELD DISCONNECT
NOTE #4
EQUIPMENT GROUND
SPARE-1
HEAT
SPARE-2
COOL
NOTE #8
COM
HSIR
EAC-1
START
OL
COM
HI
MED HI
MED LO
LO
BLWM
SCHEMATIC DIAGRAM
(NATURAL GAS & PROPANE)
EAC-2
1
1
HSI
2
PL5
2
PL2
3
PL3
PR2
115VAC
PR1
TRAN
24VAC
1
2
M
IDR
TEST/TWIN
FU1
NOTE #7
IDM
OL
AUX
CAP -2
CAP-1
L2
FRS
LS
LGPS
(WHEN USED)
NOTE #6
PL1
PRS
8
FSE
9
6
5
CPU
HSIR
IDR
BLWR
Y
G
C
R
W
GVR-2
SEC-1
HI/LO
GVR
GVR-1
SEC-2
NOTES:
32285
4
-1
0
1
REV
. G
1. IF ANY OF THE ORIGINAL EQUIPMENT WIRE IS REPLACED USE WIRE RATED FOR 105
∞
C.
2. INDUCER (IDM) AND BLOWER (BLWM) MOTORS CONTAI N INTERNAL
AUTO-RESET THERMAL OVERLOAD SWITCHES (OL).
3. BLOWER MOTOR SPEED SELECTIONS ARE FOR AVERAGE CONDITIONS, SEE INSTALLATION
INSTRUCTIONS FOR DETAI LS ON OPTIMUM SPEED SELECTION.
4. USE ONLY COPPER WIRE BETWEEN THE DISCONNECT SWITCH AND THE
FURNACE JUNCTION BOX (JB).
5. THIS WIRE MUST BE CONNECTED TO FURNACE SHEETMETAL FOR CONTROL TO PROVE
FLAME.
6. FACTORY CO NNECTED WHEN LGPS NOT USED.
7. REPLACE ONLY W ITH A 3 AMP FUSE.
8. YELLOW LEAD NOT ON ALL MOTORS.
9. BLOWER-ON DELAY, GAS HEATING 60 SECONDS, COOLING OR HEAT PUMP 2 SECONDS.
10. BLOWER-OFF DELAY, GAS HEATING 90, 135, 180 OR 225 SECONDS, COOLING OR
HEAT PUMP 90 SECONDS. (135 SECONDS ONLY ON SOME MODELS)
11. IGNITION-LOCKOUT WILL OCCUR AFTER FOUR CONSECUTIVE UNSUCCESSFUL
TRIALS-FOR-IGNITION. CONTROL WILL AUTO-RESET AFTER THREE HOURS.
12. SOME MODELS MAY HAVE SPAD E QUICK CONNECT TERMINALS.
13. GAS VALVE LEADS ARE INTERCHANGEABLE ON SINGLE STAGE VALVES.
BL
K
OM
SW2
SW1
OM
2
3
4
7
1
OM
HUM
1 2 3
WH
T
BL
K
YEL
PL4
PL4
2
3
1
NEUTRAL
WHT
ILK
FU2
BLK
L1
ILK
(NOT ON ALL MODELS)
SEE NOTE #10
NOTE #12
GRN/YEL
GRN/YEL
GR
N
GND
NOTE #5
GRN/YEL
NOTE #5
L2
NOTE #13
NOTE #13
GV
GV
11
→