Generac Power Systems IM Series User Manual
Page 16
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
tactor and to the cable terminal on Starter Motor. Engine
should crank.
Test Results:
A. Engine cranks normally but does not crank when using
the Start/Stop Switch: Go to Step 5.
B. Engine does NOT crank: Replace Starter Motor SM
C. Engine cranks normally with jumper cable and with
Start/Stop Switch: STOP tests.
NOTE: For Starter Motor SM testing and repair In-
Structlons, refer to ENGINE SERVICE MANUAL.
Step 5- Check Start/Stop Switch SW1
Test Procedure:- See Figure 3. Test the Start/Stop
Switch as follows:
1, Set a Volt-Ohm-Milliammeter (VOM) to its "Rxl" scale
and zero the meter. Connect one VOM test lead to the
Wire 0 terminal of Start/Stop Switch; connect second
meter test lead to a clean frame ground. The VOM should
indicate continuity.
Test Results:
A. VOM does NOT indicate continuity: Repair or replace
Wire 0 between Switch and frame ground connection, as
necessary.
B. VOM indicates continuity: Continue test.
2. Connect a jumper wire between the Start/Stop Switch
Wire 17 terminal and a clean frame ground connection.
Engine should crank and start. Disconnect jumper wire to
terminate cranking when engine starts. To stop the en
gine, connect jumper wire to Wire 18 terminal of
Start/Stop Switch and to frame ground.
Test Results:
A. Engine cranks, starts and shuts down normally when
using jumper wire, but not when using Start/Stop Switch:
Replace Start/Stop Switch.
B. Engine will not crank when using jumper wire: Go to
Step 6.
C. Engine cranks and stops normally when using jumper
wire and with Start/Stop Switch: STOP tests.
Step 6- Check Control Relay CR1
NOTE:
See
WIRING
DIAGRAM
&
ELECTRICAL
SCHEMATIC on Page 11. Two different types of Con
trol Relay CR1 are used on the NP series generators,
Identified In the Wiring Diagram as "CRI" and "Al-
ternateCRl". Also see Figures 4 and 5
Test Procedure:- See Figure 4 or 5. Test the Relay as fol
lows:
1. Connect the positive (+) test lead of a d-c voltmeter to
CRI terminal 12 (Wire 15 terminal): connect the negative
(-) test lead to a clean frame ground. Meter should indi
cate battery voltage. If alternate CRI is installed, connect
meter positive (+) test lead to Relay terminal 9 (Wire 15
terminal).
Test Results:
A. Battery voltage is indicated; Continue test
B. Battery voltage is NOT indicated:- Repeat Step 1. Also
check Wire 15 between Relay CRI and Fuse FI for open
or disconnected condition; Wire 13 between Fuse FI and
Starter Contactor SC for open; and positive (+) battery
cable to Starter Contactor SC.
2. Connect the positive (+) test lead of a d-c voltmeter to
CRI terminal 2 (Wire 56 terminal); negative (-) test lead
to frame ground. If alternate CRI is installed, connect
meter positive (+) test lead to Relay terminal 3 (Wire 56
terminal). Battery voltage should be indicated.
Test Results:
A. Battery voltage NOT indicated: Replace Control Relay
CRI
B. Battery voltage was indicated: Repeat Steps 1 through
5. Refer to WIRING DIAGRAM (Page 11) and test wires
for open or shorted condition.
14