beautypg.com

Assembly, Checklist – Sears 917.25147 User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

ASSEMBLY

/CHECKLIST

BEFORE YOU OPERATE AND ENJOY YOUR NEW

TRACTOR, WE WISH TO ASSURE THAT YOU RECEIVE

THE BEST PERFORMANCE AND SA TISFACTION FROM
THIS QUALITY PRODUCT

PLEASE REVIEW THE FOLLOWING CHECKLIST:

/ All assembly instructions have been completed.

/ No remaining loose parts in carton.

/ Battery is properly prepared and charged. (Minimum

1 hour at 6 amps).

/ Seat is adjusted comfortably and tightened securely.

/ All tires are properly inflated. (For shipping, purposes,

the tires were overinflated at the factory). .

.

/ Be sure mower deck is properly leveled side-to-side/

front-to-rear for best cutting results. (Tires must be

properly inflated for leveling). .

..

/ Check mower and drive belts. Be sure they are routed

properly around pulleys and inside all belt keepers.

/ Check wiring. See that all connections are still secure

and wires are properly clamped.

WHILE LEARNING HOW TO USE YOUR TRACTOR, PA Y

EXTRA ATTENTION TO THE FOLLOWING IMPORTANT

ITEMS:

/ Engine oil is at proper level.

/ Fuel tank is filled with fresh, clean, regular unleaded

gasoline.;

/ Become familiar with all controls - their location and

function. Operate them before you start the engine.

/ Be sure brake system is in safe operating condition.

10