beautypg.com

Phase iii, Installation - piping, Figure 1 – TriangleTube TR Series User Manual

Page 11

background image

Phase III

®

8

Installation - Piping

Cold Water

Inlet

6

1

12" min.

Heat Trap

Loop

12" min.

Heat Trap

Loop

1

5

5

1

10

9

4

13

M

H

C

Cold Water

Inlet

6

1

12" min.

Heat Trap

Loop

12" min.

Heat Trap

Loop

4

1

5

5

1

10

13

9

M

H

C

Standard Installation
Domestic Piping
TR Series

1. Shut-off valve
4. T&P relief valve
5. Unions
6. Backflow preventer or pressure reducing valve(*)

9. Drain valve
10. Thermal expansion tank (potable)
13. Thermostatic mixing valve (optional)

(*) Optional devices may be required by local codes.

Standard Installation
Domestic Piping
SMART Series

Figure 1

This manual is related to the following products: