17.

After the adhesive and thin-set materials are in place, rotate

the pan back into place for installation.

(Hint) In order to reach the pan without stepping on the adhesive,
place a short piece of wood over the drain area. Use this to step
on to remove the 2 x 4 that is holding the pan against the back

framing. (See Figure 14).

18.

19.

Before moving on to installing the shower wall
enclosure, level the pan as shown in Figure 15. The

shower pan has minimal slope to the drain, and must be
very level to drain properly. Use a long level along all
finished edges. If there is an out of level condition, remove
screws and adjust the shower pan. When satisfied with the fit,

re-install the mounting screws.

Before the adhesive cures, confirm the floor slope to the

drain has been maintained. To do this, remove the cardboard
protection from the floor and use a 2 foot level at various points
around the drain to the adjacent wall to check for draft. Make
sure there is a downward slope to the drain in all directions
around the drain. Visually inspect the floor to be sure there are
no humps or dips that could cause improper drainage.

See Figure 16A and 16B.

Rotate the pan back to the horizontal position. As you lower the
pan to the sub floor, align the drain pipe with the drain fitting,

and with the pencil mark at the front of the threshold.

NOTE: The working life of the flooring adhesive is roughly
one hour. (Refer to the label on the adhesive for actual
working time). After step 16 is complete, the entire
installation process though step 21 must continue. If for
any reason the installation cannot be completed within the
working time of the adhesive, after step 16, jump ahead to
step 21.

When the pan is seated into the adhesive, place the cardboard
on the shower floor for protection. Thoroughly walk around in

the shower. This will assist in seating the pan into the adhesive.

Attach the pan to the studs by installing the screws through
the holes drilled into the flange. Snug the screws up tight but
not to the point of flange breakage. The screws must be tight
so they will not interfere when the wall board and finshed

walls materials are installed.

Figure 14

Figure 15

8

Figure 16B

Figure 16A

2 Ft. Level

Floor Level To
Drain - No Humps

Wood