beautypg.com

Installation guide, For linear shower pan recessed into concrete, Step 12 – Trending Accessibility Transitional & modern linear fusion shower pan recessed into concrete User Manual

Page 5: Step 9, Step 11, Step 10

background image

Installation Guide

www.trendingaccessibility.com

[email protected]

5

for linear shower pan recessed into concrete

Step 9

If the Fusion Pan is above the level of the floor, use

a screed bed to raise the floor.

Check that the Linear Fusion Pan is level on all four

sides.

Fill in any gaps around the perimeter of the pan over

1/8” with latex or acrylic caulk.

Do not use 100% silicone.

Step 12

Begin taping the wetroom floor at the interior corners

of the Linear Fusion Pan using the corner pieces of

the crack isolation tape provided. Using a paint brush

or trowel, slather liquid waterproofing into corner,

press piece into place, then apply liquid waterproof-

ing on top. Make sure to smooth out any creases.

Repeat for additional corners.

Step 11

You will now begin waterproofing the wet room.

BEST PRACTICE: To achieve the best results, we

recommend waterproofing the whole room.

Minimum requirements, shown in these instruc-

tions, show you that you only have to waterproof

the shower zone, which is 6 ½ feet high and about

2 feet outside of the showering area.

Materials needed for wet room waterproofing.

Step 10

Make your final connections to the drain. Make

sure connection is snug but do not over tighten.