Installation guide, For fusion shower pan on wood joists, Step 16 – Trending Accessibility Fusion shower pan on wood joists User Manual
Page 7: Step 13, Step 14, Step 15
Installation Guide
www.trendingaccessibility.com
7
for fusion shower pan on wood joists
Step 13
Attach the drain adapter flange to the Fusion Pan.
First, set the adapter in place, mark the 4 holes,
and pre-drill them with a 1/8” bit.
Then, apply a bead of caulk (Recommended: DAP
Dynaflex 230) to the underside of the drain adapter
flange. Lightly push the flange into place, and
screw it down using the four ¾” screws provided.
Remove any excess caulk that squeezes out.
membrane clamp
height adjustment ring
Remove the tile height adjustment ring and membrane clamp and
place to one side; these will be required later in the installation.
Step 14
Make your final connections to the drain. First
apply a bead of caulk (Recommended: DAP
Dynaflex 230) to the underside of the strainer body.
Pass the strainer through the drain adapter flange,
and tighten. Make sure connection is snug but do
not over tighten.
Step 16
Begin taping the wetroom floor at the interior corners
of the Fusion Pan using the corner pieces of the
crack isolation tape provided. Using a paint brush or
trowel, slather liquid waterproofing into corner, press
piece into place, then apply liquid waterproofing on
top. Make sure to smooth out any creases. Repeat for
additional corners.
Step 15
You will now begin waterproofing the wet room.
BEST PRACTICE: To achieve the best results, we
recommend waterproofing the whole room.
Minimum requirements, shown in these
instructions, show you that you only have to
waterproof the shower zone, which is 6 ½ feet high
and about 2 feet outside of the showering area.
Materials needed for wet room waterproofing.
Gasket Clamp
Adapter Drain Flange