Installation guide, For fusion shower pan on wood joists, Step 12 – Trending Accessibility Fusion shower pan on wood joists User Manual
Page 6: Step 9, Step 10, Step 11
![background image](/manuals/714792/6/background.png)
Installation Guide
www.trendingaccessibility.com
6
for fusion shower pan on wood joists
Step 9
To prep for permanent installation, remove the Fusion
Pan from the surface. Apply a generous amount of
construction adhesive to the joists and the plywood
floor surface.
Step 10
Carefully set the Fusion Pan into place. Drill and
countersink holes in the Fusion Pan. Using the 2 ½”
screws provided, attach the pan. Do not aggressively
screw and over tighten, as you may force the Fusion
Pan out of level.
Step 11
On top of existing subfloor install cement
backerboard in preparation for tiling. Make sure
that the top of the backerboard is roughly 1/8”
higher than the Fusion Pan.
Step 12
Check that the Fusion Pan is level on all four sides.
Fill in any gaps around the perimeter of the pan over
1/8” with latex or acrylic caulk.
Recommended: DAP Dynaflex 230
Do not use 100% silicone.