beautypg.com

Speed release – Tie Down Dock Ladder User Manual

Page 2

background image

051214,a709

Instruction Part #15360

Used with Tie Down's Dock Ladder:
3 Step 49" Galvanized #28273 / Painted #27273
4 Step 60" Galvanized #28274 / Painted #27274
5 Step 71" Galvanized #28275 / Painted #27275

Speed Release

(Purchased Separately)

Part #27271

Speed Release/Dock Placement

TOOLS REQUIRED
Flathead screwdriver, 7/16" wrench, hand or power drill, and a
1/4" drill bit.

ASSEMBLY INSTRUCTIONS
1. Attach the Speed Release side plates under the bottom of the
ladder braces as shown in the picture, using the 1/4" x 1-1/2"
Phillips flat head screws and acorn nuts. Acorn nuts are used on
the top. Make sure that the side flanges are located to the
outside edge of the ladder brace. Do not tighten at this time.
Using the Speed Release base as a guide, make sure the tabs
are centered in the base openings. Now tighen the acorn nuts.

2. Before attaching the ladder to the dock, check for
obstructions under the dock where the bolt holes will be drilled.
Should you have a floating dock, make sure the ladder will not
be damaged in fluctuating water levels. The ladder should be
flush against the top side of the dock with the Speed Release
base attached to the ladder. To mark the holes, use the base
plate as a template. Drill four holes using your 1/4" drill bit.
Attach ladder to dock with the four 1/4" x 4" stove bolts
furnished in the Dock Ladder hardware bag.

IMPORTANT:

LADDER WILL FALL INTO WATER IF NOT BOLTED TO THE

DOCK. BE CAREFUL WHEN USING LADDER TO MARK HOLES.

SET LADDER COMPLETELY ON TOP OF DOCK AFTER USING TO

MARK THE HOLES TO BE DRILLED.

Item #

Description

Qty

1

Speed Release Base

1

2

Speed Release Side Plate Left

1

3

Speed Release Side Plate Right

1

4

1/4" x 1-1/2" Phillips Flat Head Screw

4

5

Acorn Nut

4

6

1/4" x 4" Stove bolt, flat washer & Nut

NA

Furnished in Dock Ladder Hardware Bag

Dock

Release

Base

Side

Plate

Ladder should be

flush to the dock

1

6

6

2

3

4 & 5

4 & 5

TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336

www.tiedown.com (404) 344-0000 Fax (404) 349-0401