Fieldpilot, Installation, Prepare the fieldpilot valve block – TeeJet FieldPilot Install John Deere 8x00 User Manual
Page 10
www.teejet.com
9
FieldPilot
®
INSTALLATION
If there are questions concerning the installation of the FieldPilot system on this vehicle, or due to
the changes in component specifications the parts supplied in the kit are not exactly as presented
in this document, please contact your dealer or TeeJet Customer service representative for
clarification before installation. TeeJet Technologies is not responsible for misuse or incorrect installation of
the system.
NOTE: BE VERY CAREFUL TO ABSOLUTELY SECURE ALL CABLES AND HOSES SO THAT THEY
DON’T INTERFERE WITH THE MANY MOVING PARTS OF THE MACHINE!
1. PREPARE THE FIELDPILOT VALVE BLOCK
Make sure the FieldPilot valve block is clean and free of dust. Work on a clean bench. Remove the plastic
plugs and install straight adapter
(P)
in the P, T, A, B, and LS ports. Take care not to damage the o-rings on
the adapters during this process.
Figure 1-2: Preparing FieldPilot Valve Block
P
P