beautypg.com

TeeJet CenterLine with Swath Manager 5 User Manual

Swath, Manager 5, Swath manager 5 functions

background image

Automa

ted Boom Section Contr

o

l f

o

r CenterLine

Automated Boom Section Control

Swath

Manager 5

98-01166-R0

Page 1 of 2

Swath Manager 5 Functions

Auto control up to five boom sections.

The CenterLine determines when sections are in or out of an applied region.

The Rate Controller maintains full control over product application.

Boom Sections are activated and deactivated based on the percentage of boom
overlap setting (0%, 50%, 100%).

Installation

Cable 45-05462 & 45-05463

Connect between controller and main harness

Cable 45-05467

Use T-Taps supplied with harness to tap into the signal wire between switchbox or
existing switches and boom shutoff valves.

Figure 1: %Overlap Examples

Figure 2: Installation System Diagrams

0%

50%

100%

SM5 Controller Harness

TeeJet - 45-05462

Raven - 45-05463

Existing

Controller Harness

MASTER

5

4

3

2

1

BOOM CONTROL

AUTO
BOOM

DISENGAGE

ENGAGE

Swath Manager 5

Automated Boom
Section Control

844-x

SPR

AYER C

ONTROL

ON

P

RO

AUTO

MAN

ON

OFF

Rate Controller

Valves

IGN Sense

CenterLine

Status Detect

(Not used)

Power

Cable

45-05324

GPS IN

Cable

SM5 to CenterLine

45-05461

Not Used

Swath Manager 5

78-08065

SM5 Harness,

Exsisting Switches or Switchbox

45-05467

To Accessory Power

or Battery

Existing switches or switchbox

Swath Manager 5

78-08065

IGN Sense

CenterLine

Status Detect

(Not used)

Power

Cable

45-05324

GPS IN

Cable

SM5 to CenterLine

45-05461

Not Used

Valves

MASTER

5

4

3

2

1

BOOM CONTROL

AUTO
BOOM

DISENGAGE

ENGAGE

Swath Manager 5

Automated Boom
Section Control

Wire Splice

50-10097