TeeJet CenterLine with Swath Manager 5 User Manual
Swath, Manager 5, Swath manager 5 functions

Automa
ted Boom Section Contr
o
l f
o
r CenterLine
Automated Boom Section Control
Swath
Manager 5
98-01166-R0
Page 1 of 2
Swath Manager 5 Functions
•
Auto control up to five boom sections.
•
The CenterLine determines when sections are in or out of an applied region.
•
The Rate Controller maintains full control over product application.
•
Boom Sections are activated and deactivated based on the percentage of boom
overlap setting (0%, 50%, 100%).
Installation
Cable 45-05462 & 45-05463
•
Connect between controller and main harness
Cable 45-05467
•
Use T-Taps supplied with harness to tap into the signal wire between switchbox or
existing switches and boom shutoff valves.
Figure 1: %Overlap Examples
Figure 2: Installation System Diagrams
0%
50%
100%
SM5 Controller Harness
TeeJet - 45-05462
Raven - 45-05463
Existing
Controller Harness
MASTER
5
4
3
2
1
BOOM CONTROL
AUTO
BOOM
DISENGAGE
ENGAGE
Swath Manager 5
Automated Boom
Section Control
844-x
SPR
AYER C
ONTROL
ON
P
RO
AUTO
MAN
ON
OFF
Rate Controller
Valves
IGN Sense
CenterLine
Status Detect
(Not used)
Power
Cable
45-05324
GPS IN
Cable
SM5 to CenterLine
45-05461
Not Used
Swath Manager 5
78-08065
SM5 Harness,
Exsisting Switches or Switchbox
45-05467
To Accessory Power
or Battery
Existing switches or switchbox
Swath Manager 5
78-08065
IGN Sense
CenterLine
Status Detect
(Not used)
Power
Cable
45-05324
GPS IN
Cable
SM5 to CenterLine
45-05461
Not Used
Valves
MASTER
5
4
3
2
1
BOOM CONTROL
AUTO
BOOM
DISENGAGE
ENGAGE
Swath Manager 5
Automated Boom
Section Control
Wire Splice
50-10097