Sonics VCX750 User Manual
Page 6
1
SECTION I – INSTALLATION
INSPECTION
Prior to installing the Ultrasonic Processor, perform a visual inspection to detect any
evidence of damage which might have occurred during shipment. Before disposing of
any packaging material, check it carefully for small items.
The equipment was thoroughly inspected and carefully packed before leaving our
factory. The carrier, upon acceptance of the shipment, assumed responsibility for its
safe delivery. Claims for loss or damage sustained in transit must be submitted to the
carrier.
If damage has occurred, contact your carrier within 48 hours of the delivery date. DO
NOT OPERATE DAMAGED EQUIPMENT. Retain all packing materials for future
shipment.
ELECTRICAL REQUIREMENTS
The Ultrasonic Processor requires a fused, single phase 3-terminal grounding type
electrical outlet. For power requirements, check the label on the back of the unit.
INSTALLING THE ULTRASONIC PROCESSOR
The Ultrasonic Processor should be installed in an area that is free from excessive
dust, dirt, explosive and corrosive fumes, and extremes of temperature and humidity.
If processing flammable liquids, use an approved fume hood and do not place the
power supply in the fume hood.
When positioning the unit, be sure to leave adequate space behind the unit so that all
connections can be easily disconnected.
WARNING
For your personal safety, do not, under any
circumstances, defeat the grounding feature of the
power cord by removing the grounding prong.