beautypg.com

Sonics VCX750 User Manual

Page 6

background image

1

SECTION I – INSTALLATION

INSPECTION

Prior to installing the Ultrasonic Processor, perform a visual inspection to detect any
evidence of damage which might have occurred during shipment. Before disposing of
any packaging material, check it carefully for small items.

The equipment was thoroughly inspected and carefully packed before leaving our
factory. The carrier, upon acceptance of the shipment, assumed responsibility for its
safe delivery. Claims for loss or damage sustained in transit must be submitted to the
carrier.

If damage has occurred, contact your carrier within 48 hours of the delivery date. DO
NOT OPERATE DAMAGED EQUIPMENT. Retain all packing materials for future
shipment.

ELECTRICAL REQUIREMENTS

The Ultrasonic Processor requires a fused, single phase 3-terminal grounding type
electrical outlet. For power requirements, check the label on the back of the unit.

INSTALLING THE ULTRASONIC PROCESSOR

The Ultrasonic Processor should be installed in an area that is free from excessive
dust, dirt, explosive and corrosive fumes, and extremes of temperature and humidity.
If processing flammable liquids, use an approved fume hood and do not place the
power supply in the fume hood.

When positioning the unit, be sure to leave adequate space behind the unit so that all
connections can be easily disconnected.

WARNING

For your personal safety, do not, under any

circumstances, defeat the grounding feature of the

power cord by removing the grounding prong.

This manual is related to the following products: