Slant/Fin EC-10 Assembly Instructions User Manual
Page 8

8
10
Put the front of the side panel into place, engaging
the lower notch of the panel in the cross bar of the base.
Make sure that the lower fold in the panel is cor-
rectly positioned under the fold of the cross bar.
Straighten the side panel and pull it upwards.
Attach the side panel to the lugs of the control panel
support, pulling its upper fold upwards such that the
upper fold of the side panel is centred and blocked bet-
ween the two notches.
Fix the side panels using 2 self tapping screws +
serrated washers.
5
4
1
1
3
3
1
2
8575N025B
Installing the side panels
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (36 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- CHS-FS-40 (6 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)