Slant/Fin EC-10 Assembly Instructions User Manual
Page 5

5
5
6
8575N021A
- Pass the strap
between the cast iron body and the base.
- Install the insulation around the body, folding the bottom on each side of the boiler inside the base.
1
2
8575N022
Installing the insulating material
3
2
1
Fix the insulation using the strap(s) and the attach-
ment strip
.
- Put the back insulation into place and fix it onto the pre-
viously installed insulation using the fasteners
.
notch in front
- 1 strap on the 3 and 4 section versions,
- 2 straps on the 5 and 6 section versions
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- CHS-85 (36 pages)
- CHS-FS-40 (6 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)