Slant fin corp – Slant/Fin CHS-FS-40 User Manual
Page 6
CHS 85-399 CHS Floor Stand Installation Instructions
│
Slant Fin Corp.
6
Supplemental Instructions for CHS
– Floor Stand Twinning Kit (P/N 818 220)
CHS
’s Floor Stand Twinning Kit is designed to connect CHS Floor Stands together, side by side and provide the
required boiler spacing for correct installation of the CHS 300-399 Common Venting. One Twinning Kit is
needed to connect two (2) Floor Stands together; additional Twinning Kits are required to connect additional
Floor Stands together (e.g. two Twinning Kits for three Floor Stands).
When connecting Floor Stands together, using the Twinning Kit, do so prior to
installing the boiler on the Floor Stands. Failure to follow this warning may result in
serious injury or property damage.
1). Loosen (DO NOT Remove) the bolts on the
Top and Middle Cross Members. Slide Vertical
Rail Bracket (A) over the loose bolts then
tighten.
2. Remove bolts and split-lock washers from the Bottom
Cross Member. Place the Horizontal Rail Bracket (B) over
the holes and reinstall the bolt and Split-lock Washers.
3. Check to ensure the stands are level
– correct if necessary
using Leveling Legs. Proceed with the boiler installation
– see
detailed Installation Instructions provided with the boiler.
(A) Vertical Rail
Bracket x 2
(B) Horizontal Rail
Bracket x 1
Twinning Kit Contents