Slant fin corp – Slant/Fin CHS-FS-40 User Manual
Page 2
CHS 85-399 CHS Floor Stand Installation Instructions
│
Slant Fin Corp.
2
Kit Contents
Assembly Instructions
(Steps 1-
4)
No. Item Description
1. Left Rail
2. Right Rail
3. Top Cross Member
4. Middle Cross Member
5. Bottom Cross member
6. Floor Anchor Brackets x 8
7. Leveling Legs x 4
8. 3/8” x 3/4” Bolts x10
9. 3/8” Split-lock Washers x 10
10. #14 x 3/4” Drill-point screws
x 2 (not shown)
2. Connect the Top and Middle Cross Members
to the Rails using eight (8) of the
3/8” x 3/4”
bolts and 3/8
” Split-lock Washers.
1. Install Leveling Legs into the bottom of the
Right and Left Rails. Leave a minimum of 1/2" of
the Leveling leg exposed for attaching floor
anchors in step 5.
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (36 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10 Assembly Instructions (12 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)