Slant fin corp – Slant/Fin CHS-FS-40 User Manual
Page 3
CHS 85-399 CHS Floor Stand Installation Instructions
│
Slant Fin Corp.
3
5. Overlap the Floor Anchor Brackets on the
Leveling leg as shown
with the ‘U’ cuts facing
each other. Fasten the Floor Anchor Brackets to
the floor using field supplied anchors. Perform this
exact process to each leveling leg.
3. Connect the Bottom Cross Member to the
Rails using the remaining two - 3/8
” x 3/4"
bolts and 3/8
” Split-lock Washers.
4. Tighten all the bolts; position the stand in
its final location. Using a level, adjust the 4
Leveling Legs to attain a level stand from
front-to-back and side-to-side.
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (36 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10 Assembly Instructions (12 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)