Slant/Fin CHS-FS-40 User Manual
Page 5
CHS 85-399 CHS Floor Stand Installation Instructions
│
Slant Fin Corp.
5
8. Fasten the Boiler Support Bracket to the bottom
of the boiler using the screws removed in step 6.
Before tightening, ensure the boiler is plumb.
10. Check to ensure the boiler is level
– correct if
necessary using Leveling Legs. Proceed with the
boiler installation
– see detailed Installation
Instruction provided with the boiler.
9. Secure the Boiler Support Bracket to the
Middle Cross Member using #14 x 3/4” drill-point
screws.
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (36 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10 Assembly Instructions (12 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)