Installation instructions – Reznor R6GN Option - Installation - Roof Curb User Manual
Page 3

INSTALLATION INSTRUCTIONS FOR
559538 / 559539 / 559540 / 559541
ROOF CURBS USED WITH R6GN 150/180 UNITS
Note:
Condenser Pans can be lo cated on ei ther end de pend ing on in di vid ual ap pli ca tions.
INSTALLATION
INSTRUCTIONS
Fig ure 6
NORDYNE PART#
RSI PART#
A
559538
47-201-1108
8
559539
47-201-1114
14
559540
47-201-1118
18
559541
47-201-1124
24
*A
Step 5:
Install the condenser pan (C) as shown with opening over the desired duct location as shown in Figure 6.
Step 6:
Install both condenser pans (D) as shown in Figure 6.
Step 7:
If the curb is being assembled and moved to another location, attach the condenser pans as shown in "Details".
Step 8:
Place the ¾" x 1 ¼" Gasket on all of the top edges of the roof curb, including the condenser pans.
21
SUPPLY
RETURN
17 ½
15
3
16
77 ½
74
91
94 ½
1
¾
DUCT SIZES ARE:
Return 68 ½ x 17 ¼
Supply 73 ½ x 20 ½
ROOF OPENING:
74" Long
55" Wide
(D)
(C)
SHIFT RETURN DUCT TO
CLEAR FOR POWER ENTRY
(D)
37 ¼
- UDAP Unit Installation Manual (40 pages)
 - UDBP Unit Installation Manual (44 pages)
 - UEAS Unit Installation Manual (44 pages)
 - VPS Unit Installation Manual (44 pages)
 - VPT Unit Installation Manual (40 pages)
 - VCS Unit Installation Manual (48 pages)
 - CAUA Unit Installation Manual (44 pages)
 - EEDU Unit Installation Manual (32 pages)
 - LDAP Unit Installation Manual (44 pages)
 - MASA Unit Installation Manual (40 pages)
 - RDF Unit Installation Manual (28 pages)
 - RPB Unit Installation Manual (40 pages)
 - SC Duct Furnace Unit Installation Manual (40 pages)
 - SSCBL Unit Installation Manual (60 pages)
 - X Unit Installation Manual (32 pages)
 - ZQYRA Unit Installation Manual (72 pages)
 - ADF Unit Installation Manual (28 pages)
 - F Unit Installation Manual (40 pages)
 - PDH (Indoor PreevA) Unit Installation Manual (72 pages)
 - MAPSIII Unit Installation Manual (76 pages)
 - RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
 - RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
 - YDHA Unit Installation Manual (76 pages)
 - OH Unit Installation Manual (28 pages)
 - RBL (Cabinet Blower) Unit Installation Manual (12 pages)
 - REC (Evaporative Cooling) Unit Installation Manual (12 pages)
 - RIHN Unit Installation Manual (20 pages)
 - UDAP Option - Installation - Power Venting (12 pages)
 - UDAS Option - Installation - Separated Combustion Venting (16 pages)
 - WS Unit Installation Manual (15 pages)
 - EBHB Option - Installation - Thermostat Kit (2 pages)
 - EFMA Unit Installation Manual (27 pages)
 - EWHB Unit Installation Manual (9 pages)
 - EXUB Unit Installation Manual (16 pages)
 - XAWS Unit Installation Manual (12 pages)
 - XAWU Unit Installation Manual (12 pages)
 - XBWU Unit Installation Manual (12 pages)
 - MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
 - UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
 - UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
 - UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
 - UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
 - B Option - Installation - Blower/Filter Cabinet (4 pages)
 - PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
 - VP series infrared heaters High altitude conversion instructions (12 pages)
 
